article thumbnail

We visited the OLA Future Factory: Electric Scooter Manufacturing

Plug In India

I met with Preeti Gupta, a freelancer with the BBC. I asked her about start-ups that she has liked, She talked of Bolt, which is setting up charging stations for two wheelers using 15 A plug points. The company had hired 20 Innovas for media transport, two journalists per car. Since then he has stayed with the same battery.

Future 59
article thumbnail

Electric-Car Fans Rally Around the Volt - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

How Real, How Soon, and What Must Happen Next,” which concludes the costs of creating an automotive market dominated by electric and hybrid cars are prohibitively high for the foreseeable future – as high as $49 billion for Europe alone (along with another $21 billion for battery-charging infrastructure). Volt will survive and prosper,” G.M.’s

Volt 42
article thumbnail

Electric Cars and a Smarter Grid - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

He envisioned “hundreds of thousands” of charging spots, as well as a number of stations where drained batteries could be exchanged for fresh ones. they have a degree of autonomy beyond the reach of federal government and can often make tough decisions: for example, California’s climate goals and London’s congestion charging.

Grid 47
article thumbnail

Electric Car Makers: Oregon Wants You - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

Finally, in a first-of-its-kind partnership in the United States, Mitsubishi announced a strategic alliance with Oregon to develop an electric car charging infrastructure in the state. The big problems now is how to create a battery that can charge rapidly and infrastructure to charge them. If you charge with solar, is way less.

Oregon 58