Remove Alternative Fuels Remove Colorado Remove Cost Of Remove DC
article thumbnail

Cover the Cost of Your EV Charging Project with the Charge Ahead Colorado EV Charging Rebate Program

EV Match

Charge Ahead Colorado provides funding in the form of a rebate for EV charging installations throughout the State of Colorado. If awarded, these rebates can cover a significant portion of the project costs. The program has five goals: Promote the installation of electric vehicle charging stations throughout Colorado.

article thumbnail

Flash Drive: 2024 Polestar 2 Single and Dual Motor

Clean Fleet Report

The 82 kilowatt-hour (kWh) nickel-manganese-cobalt battery can be charged 10-80% in 28 minutes using a 205 kW DC Fast charger. Because of this we don’t address issues such as long-term reliability or total cost of ownership. The all-electric range (AER) is now up to 320 miles, a 20% range increase over the 2023 model.

Motor 73
article thumbnail

How Federal and State Government Incentives Make It Easy to Become an EV Owner

Blink Charging

Note that PHEVs cannot use DC fast chargers.) Alternative Fuel Vehicle Refueling Property Credit This tax credit, which runs from now to the end of 2032, can be used for either residential homes or the installation of EVSE at businesses. Colorado In Colorado, qualified light-duty EVs purchased or leased before Jan.

article thumbnail

Flash Drive: 2023 Toyota BZ4X EV

Clean Fleet Report

It joins the line-up of cars and SUVs powered by hybrid, plug-in hybrid and hydrogen fuel cell technology that have made Toyota the world leader in electrified vehicles. 150 kW maximum DC charging. 100 kW maximum DC charging. Charging is through Level 1, 2 and 3 DC Fast Charging. Level 3 DC Fast Charging 1 hour (to 80%).

Toyota 98
article thumbnail

EV Charging Basics for Property Developers

EV Connect

DC Fast Charge. Separate connectors are used for DC Quick Charge, which vary depending on the vehicle manufacturer. Level 2 equipment installations by businesses, nonprofits, and local governments within the county can get a 25% rebate of the cost, or up to $2,000. Charge Ahead Colorado. Salt River Project.