article thumbnail

Understanding the variability of GHG life cycle studies of oil sands production

Green Car Congress

Credit: ACS, Brandt 2012. Brandt considers factors affecting energy consumption and GHG emissions from oil sands extraction, and then uses publicly available data to analyze the assumptions made in the LCA models to better understand the causes of variability in emissions estimates. —Brandt 2012. Click to enlarge.

Oil-Sands 225
article thumbnail

Suncor Energy cancels Voyageur oil sands upgrader project; acquires Total’s stake

Green Car Congress

Suncor Energy is not proceeding with the Voyageur bitumen upgrader project in the Canadian oil sands. The decision is the result of a joint strategic and economic review launched by Suncor and its joint venture partner Total E&P Canada Ltd in late 2012. The transfer of interest for cash is effective immediately.

Oil-Sands 225
article thumbnail

Annual global oil & gas capital expenditure to pass $1-trillion mark in 2012

Green Car Congress

Increased activity in the Exploration and Production (E&P) sector will be the primary driver in pushing oil and gas capital expenditure (capex) to $1.039 trillion for 2012, according to the latest report by business intelligence firm GlobalData. North America is expected to witness the highest capex globally, with $254.3

Oil 210
article thumbnail

Chevron announces successful test well at deepwater St. Malo in Gulf of Mexico

Green Car Congress

Oil flow rates, though limited by testing equipment constraints, exceeded 13,000 barrels of oil per day. The test, in Walker Ridge Block 678, targeted Lower Tertiary sands more than 20,000 feet (6,096 m) under the sea floor and was conducted during August and September 2012. Chevron’s Jack/St. billion.

Chevron 256
article thumbnail

Enterprise and Enbridge to proceed with Seaway and Flanagan South oil pipeline extensions; enhanced capacity for Canadian and Bakken crude to Gulf Coast

Green Car Congress

The expansion of the reversed Seaway Pipeline will more than double its capacity to 850,000 barrels per day (bpd) by mid-2014 and transport oil originating in the Canadian oil sands and the US Bakken shale from Cushing, Oklahoma to the US Gulf Coast at Houston, with an extension to Port Arthur/Beaumont. Enbridge Inc.

Oil 275
article thumbnail

Kinder Morgan to purchase El Paso for approximately $38B to form largest natural gas pipeline network and largest midstream energy enterprise in North America

Green Car Congress

(KMI) and El Paso Corporation on Sunday announced a definitive agreement whereby KMI will acquire all of the outstanding shares of EP in a transaction that will create the largest midstream and the fourth-largest energy company in North America with an enterprise value of approximately $94 billion and 80,000 miles of pipelines.

El Paso 225
article thumbnail

Kinder Morgan to proceed with $5B expansion of Trans Mountain pipeline from Alberta oilsands to west coast

Green Car Congress

The 1,150-km (714-mile) Trans Mountain pipeline system (TMPL) is the only pipeline system in North America that transports both crude oil from the oil sands and refined products to the west coast. Only crude oil and condensates are shipped into the United States. Source: Kinder Morgan. Click to enlarge.

Oil-Sands 207