Remove EPA Remove Portland Remove Recharge Remove Standards
article thumbnail

Navistar First Launching eStar All-Electric Truck Sales in Portland, Oregon

Green Car Congress

Portland, Oregon will be the initial launch market for Navistar’s new eStar electric truck. When it returns to its home base at the end of the day, it can be plugged in and fully recharged within six to eight hours. Earlier post.). Sales of the eStar all-electric vehicle are conducted through a wholly owned Navistar affiliate.

Portland 150
article thumbnail

Kia prepping Washington and Oregon for Soul EV launch; dealers and charging network w/ fast-chargers

Green Car Congress

The four new chargers added to Oregon’s current network of 815 DC fast chargers will increase fast-charger availability by 15% in the Portland metro area and 5% statewide. The Soul EV earned an EPA-estimated range rating of 93 miles (150 km) when the 27 kWh, 360 V, 192-cell lithium-ion polymer battery is fully charged.

Oregon 150
article thumbnail

Mitsubishi to begin offering customers test drives of North American spec i-MiEV in November

Green Car Congress

Mitsubishi i is rated by the EPA to attain 126 mpg equivalency in city driving and 99 mpg in highway driving and achieves a “real world” EPA driving range of 62 miles (98 miles in the EPA LA4 city unadjusted). The 2012 Mitsubishi i-MiEV uses the CHAdeMO protocol for high-speed EV charging. Click to enlarge.

i-MiEV 239
article thumbnail

Electric Car Makers: Oregon Wants You - Green Inc. Blog - NYTimes.com

Tony Karrer Delicious EVdriven

Not to be outdone, on Tuesday the Norwegian electric car startup, Think, was in Portland being wooed by the state as one of 8 potential places to site their first car manufacturing facility in the United States. April 10, 2009 11:51 am Link The electric car is only part of the story in Portland. — Larry 4. — jerryd 7.

Oregon 58