article thumbnail

BP to Install 45 Ecotality Blink DC Fast Charging Stations

Green Car Congress

a partner in The EV Project, will install ECOtality’s Blink electric vehicle (EV) DC Fast Chargers (480 volt 3-Phase AC input)—unveiled at the Business of Plugging In 2010 conference—at 45 BP and ARCO locations. Blink DC Fast Chargers will be available to the public at BP and ARCO locations as early as March of 2011.

DC 210
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

ECOtality and Cracker Barrel Old Country Store unveiled the first Blink Direct Current (DC) Fast Charger in Tennessee at the Lebanon Cracker Barrel location. This is the first of 12 Cracker Barrel locations statewide that will install DC Fast Chargers as a part of The EV Project.

Tennessee 170
article thumbnail

Underwriters Laboratories Named Exclusive Nationally Recognized Testing Laboratory for The EV Project

Green Car Congress

The EV Project began in October 2009 when ECOtality’s eTec was awarded a federal stimulus grant of nearly $100 million from the DOE, and will deploy 4,700 Nissan LEAF EVs for the three-year study. to test and certify eTec’s vehicle charging stations that will be used in the project.

San Diego 186
article thumbnail

President Obama Announces 48 Projects to Receive $2.4B in Grants for Next-Generation of Batteries and Electric Vehicles; To be Combined with $2.4B in Industry Cost-Share

Green Car Congress

billion in grants to US-based manufacturers to produce batteries and their components and to expand battery recycling capacity; $500 million in grants to US-based manufacturers to produce electric drive components for vehicles, including electric motors, power electronics, and other drive train components; and. Technology.

Grant 317