Remove DC Remove Fuel Economy Remove South Carolina
article thumbnail

Nissans US Roll-Out Plan for the LEAF

Green Car Congress

Nissan LEAF will be introduced to Texas and Hawaii shortly thereafter, in January 2011; North Carolina, Florida, Georgia, Washington DC, Virginia, Maryland, South Carolina and Alabama follow in April 2011; and be rolled-out to the balance of the nation beginning in Fall 2011 with availability in all markets nationwide by the end of that year.

Nissan 207
article thumbnail

MAEAA Web Links

Tony Karrer Delicious EVdriven

Ampmobile Conversions : EV conversions in South Carolina AVT : EV, conversions and hybrids Canadian ElectricVehicles LTD. Battery chargers and DC/DC converters. Battery chargers and DC/DC converters. DC PowerSystems : Mega-controller and battery regulators. Curtis Instruments : Controllersand more.

article thumbnail

Flash Drive: 2023 Polestar 2 Dual Motor Performance Plus

Clean Fleet Report

All Polestar 3 models sold in the US and Canada are built in Volvo’s manufacturing plant in Ridgeville, South Carolina. 240V (Level 2) – 11 hours (0-100%) 480V DC Fast Charging – 30 minutes at 250 kW (10-80%) It is important to note cold weather can affect the charging time and driving range. torque 0-60: 4.5