Remove Commercial Remove Installation Remove Nashville Remove Stimulus
article thumbnail

ECOtality installs first DC fast charger in Tennessee

Green Car Congress

This is the first of 12 Cracker Barrel locations statewide that will install DC Fast Chargers as a part of The EV Project. By strategically placing Blink charging stations, we are collecting the data needed to build a commercial infrastructure which will untether drivers from their garages.

Tennessee 170
article thumbnail

Underwriters Laboratories Named Exclusive Nationally Recognized Testing Laboratory for The EV Project

Green Car Congress

The EV Project began in October 2009 when ECOtality’s eTec was awarded a federal stimulus grant of nearly $100 million from the DOE, and will deploy 4,700 Nissan LEAF EVs for the three-year study. Manufacturers work with UL to develop safer products and increase consumer confidence.

San Diego 186