article thumbnail

California Startup Aurica Motors Trying to Keep NUMMI Plant Open for Manufacturing Electric Cars, Battery Swap System

Green Car Congress

Under the proposed plan, the NUMMI plant in Fremont, California would be converted into the manufacturing facility for the Aurica Motors E-Car, an all-electric vehicle, as well as Aurica’s proposed PEP (Power Exchange Package) battery swap system. The PEP station concept is not compatible with the Better Place system.

article thumbnail

The Race to Plug-In Hybrids Is On

Green Cars News

A powerful roster of key industry players in the rapidly evolving electric vehicle arena will come together at Infocast’s Opportunities in Grid-Connected Mobility in San Francisco, California. Tags: Hybrid cars hybrids plug-in plug-in hybrid. No on has a lock on this future; everything is up for grabs.

Plug-in 39
article thumbnail

A New Wildfire Watchdog

Cars That Think

Sensors that mount on buildings can just plug into a wall outlet. This has been the experience of hundreds of Californians. In the case of the 2017 Tubbs Fire, the 2018 Camp Fire, and the 2020 August Complex Fires, high winds blasted flames through populated areas in the early morning hours while residents were sleeping.

article thumbnail

GM: Let's Hash Out Open Plug-In Car Standards

Tony Karrer Delicious EVdriven

We noted in December that the Society of Automotive Engineers, or SAE, was working to update standards for the interface between plug-in electric cars and the grid, and planned to agree on a set within months. And for this ecosystem to be robust, there must be commonality, especially when owners are plugging into the electrical grid.

Plug-in 39
article thumbnail

Smart Meters and Electric Cars

Revenge of the Electric Car

This is a well written story in the Pasadena Star News about how the utilities are gearing up for the coming plug-in vehicles. Photo by Eric Tom). The new digital meters are being installed by the thousands in many utility districts, and in SoCal Edison’s case, they expect to be fully installed by 2012. By Rebecca Kimitch, Staff Writer.

article thumbnail

Coming Soon – The Electric City

Revenge of the Electric Car

Across the street from City Hall, some drivers are already plugging converted hybrids into a row of charging stations. Across the street from City Hall, some drivers are already plugging converted hybrids into a row of charging stations. Here’s the full text of the entire article, in case the link goes bad: [link].