Remove BMW Remove Installation Remove Los Angeles Remove Plug
article thumbnail

BMW expands 530e sedan inductive charging pilot program to US

Green Car Congress

BMW is bringing BMW’s global Induction Charging Pilot Program to the US. Qmerit will then complete the residential hardware installation. All costs, expenses and expenditures associated with the initial installation, maintenance and de-installation of the Ground Pad Module are covered by BMW.

BMW 247
article thumbnail

BMW i and EVgo expanding ChargeNow DC Fast program; 500 more fast chargers in US; no-cost DC and Level 2 for BMW i3 drivers

Green Car Congress

At the Los Angeles Auto Show, BMW of North America announced, in cooperation with NRG EVgo, the expansion of the ChargeNow DC Fast program. ChargeNow DC Fast also includes two years of no-cost charging for qualifying BMW i3 drivers in those areas. —Rob Healey, Head of EV Infrastructure for BMW of North America.

DC 150
article thumbnail

ABB adds 20 kW Combined Charging System (CCS) fast charger to EVSE portfolio

Green Car Congress

Its 20 kW design allows for quick and easy installation on widely available 3 x 32A low-cost grid connections. If in the future charging needs change, installed Terra 23 charging stations can be field upgraded to support the full 50 kW power level.

San Diego 296
article thumbnail

BMW, Volkswagen and ChargePoint complete EV express charging corridors on the East and West Coasts

Green Car Congress

Electric vehicle (EV) drivers can now travel the most heavily-trafficked corridors on the East and West Coasts of the United States with the installation of 95 new DC Fast charging stations as part of the Express Charging Corridors Initiative—a collaboration of BMW of North America, Volkswagen of America, Inc.

BMW 150
article thumbnail

Are The BMW i3 And i8 Electric Cars A Mission Impossible?

Green Car Reports

At the 2011 Los Angeles Auto Show, BMW introduced its press conference with a preview of the next installment of the Tom Cruise Mission Impossible movie series. BMW features prominently in this production, with its plug-in hybrid supercar i8 as one of the team’s advanced tools.

article thumbnail

VW, BMW and ChargePoint partner to create SAE Combo DC fast charging corridors on the East and West Coasts

Green Car Congress

In the initial phase, the aim is to install nearly 100 DC Fast charging ports across both coasts, with plans to expand the program to increase access to fast charging across the country. The installations will occur both within and between relevant metro areas, strategically spaced at a maximum of 50 miles (80 km) apart. to 4 hours.

DC 150
article thumbnail

BMW to partner with Coulomb Technologies in Boston; Coulomb offering new cloud-based service plans, new dual-port charging stations

Green Car Congress

BMW of North America and Coulomb Technologies announced that drivers of the BMW ActiveE all-electric vehicle ( earlier post ) will be able to take advantage of the expansion of the ChargePoint Network into the Boston Metro area. The BMW ActiveE is the BMW Group’s next step towards a mass-produced electric vehicle.

Boston 218