article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

For example, if your truck stop or c-store is located within a designated Alternative Fuel Corridor (AFC) and you want to take advantage of the Department of Transportation’s National Electric Vehicle Infrastructure program (NEVI), then you would need to install a bank of at least four 150kW DC fast chargers DCFCs to receive that funding.

Store 95
article thumbnail

IMO sets 2020 date for ships to comply with low sulfur fuel oil requirement; 5000 ppm

Green Car Congress

Further work to ensure effective implementation of the 2020 global sulfur cap will continue in the Sub-Committee on Pollution Prevention and Response (PPR). Regulations governing sulfur oxide emissions from ships are included in Annex VI to the International Convention for the prevention of Pollution from ships (MARPOL Convention).

Oil 150