article thumbnail

Gordon Murray T.27 unveiled; Zytek provides more details on 25 kW EV powertrain

Green Car Congress

27 electric vehicle program, Zytek released more details regarding the electric drivetrain developed for use in this lightweight vehicle. The program took only 17 months, including the design and build of a completely new electric powertrain by Zytek Automotive Ltd, one of the consortium partners. 27 was a £9-million (US$14.4

Zytek 218
article thumbnail

electric smart ready for production

Green Cars News

Featuring a lithium-ion battery the second generation smart electric drive’s power source will have a longer range, boast a shorter charging time and will give improved performance. The smart ed has no gear change and can reach 30 mph in 6.5 It has an electronically limited top speed of 60 mph.