article thumbnail

Ford begins pre-production of F-150 Lightning electric truck; investing $250M more in Rouge EV Center

Green Car Congress

billion in Michigan since 2016 and created and retained 7,000 jobs in the state. This truck and the Ford-UAW workers who are assembling it in Michigan have a chance to make history and lead the electric vehicle movement in America. The investment and 450 added jobs will help increase production capacity to 80,000 trucks a year.

F-150 397
article thumbnail

ONE reveals 1007 Wh/L anode-free cell that enables 600-mile Gemini battery

Green Car Congress

Our Next Energy (ONE), a Michigan-based energy storage company ( earlier post ), unveiled a 240-Ah prismatic anode-free cell after a successful 12-month R&D effort. ONE’s first-generation 1007 Wh/L cell eliminates the need for graphite and anode manufacturing equipment, enabling $50 per kWh cell cost at scale.

Miles 273
article thumbnail

Ford begins full production of F-150 Lightning electric pickup; planned annual run rate of 150k at Rouge Center

Green Car Congress

With acceleration from zero to 60 mph in the mid-4 second range with the extended-range battery, the freedom of a 10-kilowatt smart power plant on wheels, a starting price less than $40,000 before available tax credits and software updates that will make it even better over time, F-150 Lightning is attracting new customers to Ford.

F-150 370
article thumbnail

Ford begins production of 2012 Focus Electric at Michigan Assembly, C-MAX models on deck

Green Car Congress

Ford’s Michigan Assembly Plant is starting production of the 2012 Focus Electric ( earlier post )—a five-passenger, battery-electric car Ford expects will achieve more than a 100 miles per gallon equivalent (MPGe) fuel economy rating. Ford transformed Michigan Assembly Plant in Wayne, Mich., 1 gallon of gasoline=33.7

Michigan 363
article thumbnail

DOE awards $98M in tax credits to automakers and suppliers for clean technology manufacturing

Green Car Congress

The US Department of Energy (DOE) announced $150 million in clean energy tax credits to 12 businesses to build US capabilities in clean energy manufacturing; $98 million of that goes to five automakers and suppliers towards investments in domestic manufacturing equipment. Funded at $2.3 Lead organization. Description. 30 million.

article thumbnail

GM To Manufacture Electric Motors; First GM Motors Will Go Into Next-Gen Two-Mode Hybrid in 2013

Green Car Congress

An electric traction motor (right) and stator (left) at the GM Powertrain Engineering Development Center Friday, 15 January 2010 in Pontiac, Michigan. GM will invest some $246 million in the next-generation hybrid system and a manufacturing site for the motors, and will announce the new site and specifics later this week.

GM 246
article thumbnail

GM investing $449M in Hamtramck and Brownstown for next-gen electrification; vehicles and batteries

Green Car Congress

In preparation for the next generation of electric vehicles and advanced battery technologies, General Motors will invest $449 million to upgrade manufacturing processes at its Detroit-Hamtramck Assembly and Brownstown Battery Assembly plants. billion invested in Michigan-based facilities alone. This includes more than $2.8