article thumbnail

TeraWatt developing I-10 network of electric heavy-duty charging centers

Green Car Congress

TeraWatt Infrastructure is developing the first network of high-powered charging centers for heavy-duty and medium-duty electric trucks along the Interstate 10 (I-10) highway, stretching from the Port of Long Beach - Los Angeles, California to the El Paso, Texas area.

El Paso 448
article thumbnail

A Plug-in Hybrid Electric Vehicle Wants to Visit Your School

Spirit of DC - PHEV3A

PRLog (Press Release) – Feb 06, 2009 – The "Spirit of DC's" on the road again on its Sun Belt Grand Finale from San Francisco to Washington, DC. The plug-in hybrid vehicle the “Spirit of DC" was designed to run on electricity alone for about 10 miles before reverting back to acting like an ordinary hybrid.

Plug-in 36