article thumbnail

Where to Start with EV Charging for Convenience Stores & Truck Stops

Blink Charging

Convenience stores and truck stops are in a fantastic position to take advantage of available federal funding for DC fast charging stations. If you prefer EVs to charge for less than an hour, DC fast chargers can help your location serve more drivers per hour. Not located in a designated AFC?

Store 95
article thumbnail

Blink’s 2023 Year in Review

Blink Charging

The year began with Blink’s exhibit at the Consumer Electronics Show (CES) where we debuted the EQ 200 for European and Latin American (LATAM) markets, Series 3 for Asia-Pacific (APAC) and LATAM markets, PQ 150 for European markets, and the Series 9 30kW DC Fast Charger for global markets.

article thumbnail

Three Major Sources of Funding for EV Charging at Convenience Stores and Truck Stops

Blink Charging

National Electric Vehicle Infrastructure (NEVI) Program Each of the 50 states, Washington, DC, and Puerto Rico was allocated funds to distribute to eligible businesses. In addition, funds must be used for the installation of a bank of at least four 150kW DC fast chargers at a given location.

Store 52
article thumbnail

Everything You Should Know About the National Electric Vehicle Infrastructure Formula Program

EV Connect

On September 27, the Biden-Harris Administration announced it has approved Electric Vehicle Infrastructure Deployment Plans for all 50 States, the District of Columbia, and Puerto Rico ahead of schedule under the National Electric Vehicle Infrastructure Formula Program (NEVI for short). and Puerto Rico, had submitted their plans.

article thumbnail

ARPA-E to award $22M to 18 projects to accelerate production of macroalgae for energy and other uses; MARINER

Green Car Congress

Additionally, the team’s mechanical partial harvest technology, which allows the same plant to be cut multiple times, is expected to further reduce seeding costs by 75% compared to the state of the art. Fearless Fund – Washington, DC. coastal and open waters, which is expected to reduce the risk and cost of farm deployment.

Mariner 150