article thumbnail

US Airports Switching To Electric Buses With Help From Federal Grants

CleanTechnica EVs

Airports around the US are transitioning to electric buses as part of their effort to lower carbon emissions from their operations.

article thumbnail

Philadelphia Wins $1.47 Million Federal EV Grant

CleanTechnica EVs

City Wins $1.47M Federal Grant for Workforce Development Pilot Program Focused on Creating Jobs for Diverse Citizenry in Electric Vehicle. Million Federal EV Grant appeared first on CleanTechnica. continued] The post Philadelphia Wins $1.47

article thumbnail

Biden Administration releases $11.2M to Virginia’s NEVI winners

Teslarati

The Biden Administration released $11.295 million in federal grants to the Virginia Department of Transportation (VDOT) as part of the first round of the National Electric Vehicle Infrastructure (NEVI) Formula Program. Biden Administration opens applications for $2.5B

article thumbnail

Sea-Tac Airport launches major ground support equipment electrification project

Green Car Congress

The Port of Seattle, along with Alaska Airlines, Western Washington Clean Cities and US Representative Adam Smith unveiled a new project providing nearly 600 electric charging stations throughout the airport for ground support equipment (GSE) such as baggage tugs, bag ramps and pushback vehicles. An additional $3.5

Alaska 296
article thumbnail

International Battery to provide Li-ion system to Sunverge for Net-Zero Energy Home Project

Green Car Congress

This fully integrated distributed energy system will provide a turnkey solar solution to support a Net-Zero Home Energy demonstration at the Philadelphia Navy Yard’s Clean Energy Innovation Hub. The Energy Innovation Hub will include a live demonstration of a microgrid with a 2,700 square foot net-zero energy home.

Li-ion 199
article thumbnail

Obama Announces Steps to Boost Biofuels, Clean Coal; RFS2, BCAP, BIWG and Carbon Capture and Storage Task Force

Green Car Congress

So today I’m announcing a Carbon Capture and Storage Task Force that will be charged with the goal of figuring out how we can deploy affordable clean coal technology on a widespread scale within 10 years. In addition, technical assistance to accessing federal grants and loan programs should be readily and easily available.

Obama 218
article thumbnail

8 Reasons Government Grants Should Include Funding for Level 1 Charging Infrastructure

EV Adoption

And here is a link to a Peninsula Clean Energy case study showing a significant savings by opting for a Level 1 solution. Source: P eninsula Clean Energy EV Charging Case Study. Below are actual project costs from a variety of multifamily properties in Northern California comparing sample costs for Level 1 versus Level 2 deployments.

Grant 136