article thumbnail

Coulomb Technologies Unveils First ChargePoint America EV Charging Stations in San Jose

Green Car Congress

Coulomb Technologies has installed its first Networked Charging Station for electric vehicles in San Jose, California from its $37 million ChargePoint America program ( earlier post ). the San Jose/San Francisco Bay Area, Bellevue/Redmond, Wash., Sacramento, Calif.,

San Jose 170
article thumbnail

California Energy Commission to award $8.9M for completion of California DC fast charge North-South corridors

Green Car Congress

The California Energy Commission (CEC) has selected 8 awardees for a total of $8,875,457 in funding to install Direct Current (DC) fast charging stations on Interstate 5 (I-5), State Route 99 (SR 99), and along United States Highway 101 (US-101) from San Jose traveling South in California. US-101: San Jose to Buellton.

San Jose 150
article thumbnail

Electrify America opening first California EV fast charging station in Torrance; targeting 9 in California by year-end

Green Car Congress

The Country Hills Shopping Plaza in Torrance, California will be the site of the first DC fast charging station to open in the state as part of Electrify America’s plan to install approximately 160 charging stations in California by June 2019. Livermore-San Francisco Premium Outlets, 2774 Livermore Outlets Dr., Livermore, CA.

article thumbnail

PG&E, Calif. Energy Commission launch 4MW sodium-sulfur grid storage pilot in San Jose

Green Car Congress

The Yerba Buena Battery Energy Storage System Pilot Project charges batteries when demand is low and then sends reserved power to the grid when demand grows. The system has a 4 megawatt capacity, and can store more than six hours of energy.

San Jose 277
article thumbnail

Electrify America releases $300M Cycle 2 national ZEV investment plan; metro charging, autonomous charging, renewable generation

Green Car Congress

The $300-million investment will build on Electrify America’s initial priorities and expand into new areas, where the need for electric vehicle charging stations and technology are greatest or are most likely to be used regularly. Highlights of the National Cycle 2 ZEV Investment Plan include: Charging Infrastructure.

America 290
article thumbnail

Electrify America to install 2,800 charging stations at workplaces and multi-unit dwellings across US

Green Car Congress

Electrify America LLC announced it will install more than 2,800 workplace and residential charging stations by June 2019 in 17 of the biggest metropolitan areas in the United States. The 2,800 Level 2 charging stations will be located at approximately 500 sites, all with more than one charging station. Earlier post.).

article thumbnail

Coulomb Technologies ships more than 2,400 public and commercial charging stations in ChargePoint America Program

Green Car Congress

Coulomb Technologies has shipped more than 2,400 public and commercial charging stations for electric vehicles through its $37-million ChargePoint America program. Coulomb says it has seen strong demand in all 10 regions of the program and is finalizing the installation of charging stations within these regions.