First-of-a-Kind Field Test for Enhanced Coalbed Methane Recovery with Simultaneous CO2 Sequestration
Green Car Congress
SEPTEMBER 9, 2009
These wells have been producing coalbed methane and water since 2004. In advance of CO 2 injection, horizontal coalbed methane wells were drilled in a modified five-spot pattern over a 200-acre area into the unmineable Upper Freeport coal seam, 1,200 to 1,800 feet below ground, and separately into the overlying mineable Pittsburgh coal seam.
Let's personalize your content