article thumbnail

In San Jose area? Come join us next week!

Revenge of the Electric Car

The conference goes from July 26-29th in San Jose, CA, and Public Night will open the doors to the exhibit hall of the San Jose Convention Center to the public from 5:30-7:30pm, where you can check out upcoming EV models such as the Nissan LEAF, Ford Escape Hybrid, Chevrolet Volt, and more.

San Jose 124
article thumbnail

GM Announcing Volt Pricing and Ordering Tomorrow; Video Web Chat with Volt Team at 4pm ET

Green Car Congress

Joel Ewanick, GM vice president of US marketing will announce pricing and ordering details for the 2011 Chevrolet Volt tomorrow (27 July) at the Plug-In 2010 conference in San Jose, Calif today at 12:00 PM ET. Deliveries of the Volt will begin later this year at participating Chevrolet dealers in launch markets.

Volt 210
article thumbnail

Chevy Volt Price Announced

Green Car Reports

The 2011 Chevrolet Volt has been in gestation so long, we've wondered if it ever would become a reality. GM announced the price for the 2011 Volt at Plug-In 2010, a conference being held this week in San Jose. The Volt's MSRP will be $41,000, which includes a $720 destination fee. Now the reality is here.

Volt 141
article thumbnail

Coulomb Technologies ships more than 2,400 public and commercial charging stations in ChargePoint America Program

Green Car Congress

Coulomb’s ChargePoint America program provides approximately 4,500 charging stations to program participants in ten regions in the United States: Austin/San Antonio, Texas, Boston, Los Angeles, New York, Orlando/Tampa, Sacramento, Calif., San Jose/San Francisco Bay Area, Redmond/Bellevue, Wash.,

article thumbnail

Nissan to Warranty LEAF Battery for 8 Years, 100,000 Miles

Green Car Congress

in his talk at the opening plenary of Plug-in 2010 in San Jose, California. The warranty matches the term of the 8-year, 100,000 battery pack warranty announced by GM for its Volt EREV. Earlier post.). The MSRP for the LEAF starts at $32,780; the full Federal tax credit of $7,500 brings that down to $25,280.

San Jose 186
article thumbnail

Federal Realty partners with Car Charging Group to install EV charging stations at retail sites nationwide

Green Car Congress

During the first phase of the program, EV charging stations will be installed at the following Federal Realty Investment Trust properties: Santana Row in San Jose, California. At these locations, Car Charging Group will install Level II, 240-volt, EV charging stations, manufactured by Coulomb Technologies.

article thumbnail

Car “charging treasure”: the third option besides charging piles and battery replacement

Setec Powerr

The startup’s service is currently available in the San Francisco Bay Area, San Jose, Los Angeles and Dallas. 20-volt Level 1 chargers and 240-volt Level 2 fast chargers. Many countries already run on 240-volt grids and only need a basic cable adapter to fast charge their cars.